Tunnel lifecycle management for two road authorities
Two road authorities, one shared process, and the first system providing a nationwide view of tunnel status.
Two road authorities both work on tunnels and had no shared system or process for managing them. The application was built to give them one, and produced something along the way that had never existed before: a single view of the status of every tunnel in the country.
Context
March 2020 to April 2022, through Sopra Steria.
The work involved a road authority responsible for planning, building and maintaining roads, and a partner road authority. They needed a common system and process for managing tunnels. The web application covers the full tunnel lifecycle: planning, carrying out safety inspections, following up faults, and maintenance.
The effect was to digitize, standardize, centralize and modernize work that had not previously been supported by a shared system. Access is role-based: a user’s roles determine the views they reach and the actions available to them.
I joined after the project was established and roughly six months into development.
Traffic-law case management
From October 2021 to April 2022, running alongside the tunnel work, a second system for the same customer: a case management application for the department handling traffic law: appeal cases, laws, regulations and hearings.
The goal was to digitize and improve the department’s work. The application gave that work a defined workflow, an overview, and statistics for cases of that kind. I built it from scratch and took it through commissioning of the first deployment, verifying it from development through to production, alongside new features and bug fixes.
My role
Full-stack developer across multiple parts of the application, and responsible for its testing at every level: unit, integration, and end to end.
The end-to-end layer was my call. Working with the test lead, I built it for the business logic users needed to work reliably at all times. These tests exercise real user interactions, which means the frontend and backend dependencies are verified together rather than each in isolation. The failure mode being a system whose parts all pass their own tests and do not work when connected.
Unit and integration tests tell you the pieces are right. They cannot tell you the assembled thing does the job.
Between mid-August and November 2021, following a colleague’s paternity leave and the project’s move into maintenance mode, I was the only developer on it.
The team: technical project lead, in-house project lead, in-house product owner, test lead, two web designers, three developers.
Tradeoffs
End-to-end tests cost you. They can turn into a lot of work, and a lot of adjustment, if you introduce them too early. The application is still moving underneath them, and every change to it is a change to the tests.
Outcome
The work processes this replaced had not been supported by a shared system, and the two organizations had no common way of running them. Afterwards they did, in one place, with the tunnel lifecycle handled end to end.
The part with no precedent is the view it opened up. Until this existed, nobody could see the status of every tunnel in the country at once.
Java · Spring Boot · Hibernate · TypeScript · React.js · Oracle Database · MySQL · H2 · Jenkins · Ubuntu