<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Project-Management on Ole Rabanal</title><link>https://omrr.no/tags/project-management/</link><description>Recent content in Project-Management on Ole Rabanal</description><generator>Hugo</generator><language>en-US</language><lastBuildDate>Fri, 01 Aug 2025 00:00:00 +0000</lastBuildDate><atom:link href="https://omrr.no/tags/project-management/index.xml" rel="self" type="application/rss+xml"/><item><title>Modernizing a data platform for a telecom provider</title><link>https://omrr.no/projects/telecom-data-platform/</link><pubDate>Fri, 01 Aug 2025 00:00:00 +0000</pubDate><guid>https://omrr.no/projects/telecom-data-platform/</guid><description>&lt;p&gt;A legacy platform had grown across thirteen repositories, about sixty&#10;endpoints and more than two hundred stored procedures. Nobody held the whole&#10;picture. The work was to recover the business logic buried in it, and to&#10;replace it with something that produced the same outcomes from far fewer&#10;moving parts.&lt;/p&gt;&#10;&lt;h2 id="context"&gt;Context&lt;/h2&gt;&#10;&lt;p&gt;A leading telecom provider, from August 2025, as architect through Sonat AS.&lt;/p&gt;&#10;&lt;p&gt;It is a classic pattern: an old system is given more and more responsibility&#10;over time, and grows to meet it. Business rules ended up mostly in the&#10;database, as stored procedures with no version history, no tests, and no&#10;boundary between one domain and the next. The behavior was real and the&#10;business depended on it, but it was not written down anywhere except in the&#10;implementation.&lt;/p&gt;</description></item><item><title>Reservoir optimization MVP</title><link>https://omrr.no/projects/reservoir-optimization-mvp/</link><pubDate>Thu, 01 May 2025 00:00:00 +0000</pubDate><guid>https://omrr.no/projects/reservoir-optimization-mvp/</guid><description>&lt;p&gt;An existing reservoir production optimizer required extensive manual&#10;configuration for every single simulation. The algorithm was not the problem.&#10;The problem was that nobody outside the team could run it.&lt;/p&gt;&#10;&lt;h2 id="context"&gt;Context&lt;/h2&gt;&#10;&lt;p&gt;May to August 2025, through Sonat AS.&lt;/p&gt;&#10;&lt;p&gt;The MVP was a prototype application to streamline demo sessions and testing&#10;scenarios for stakeholders, cutting configuration time and presenting results&#10;more legibly. The purpose was commercial as much as technical: showcasing a new&#10;approach to optimizing reservoir production for potential customers and&#10;investors.&lt;/p&gt;</description></item><item><title>Finding the shared lifecycle in three property systems</title><link>https://omrr.no/projects/three-system-consolidation/</link><pubDate>Fri, 01 Nov 2024 00:00:00 +0000</pubDate><guid>https://omrr.no/projects/three-system-consolidation/</guid><description>&lt;p&gt;A business wanted to consolidate three large systems in the property domain.&#10;Mapping them revealed that they served different stages of one lifecycle,&#10;acting on the same asset at different points in its life. That shared lifecycle&#10;gave the proposed platform its organizing model.&lt;/p&gt;&#10;&lt;p&gt;The deliverable was not software. It was a map of the three systems, an answer&#10;to whether consolidating them was possible, a design, a plan, and a fixed price&#10;for the first delivery phase with a date attached. The architecture had to be&#10;right enough to bet money on.&lt;/p&gt;</description></item></channel></rss>