<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Python on Ole Rabanal</title><link>https://omrr.no/tags/python/</link><description>Recent content in Python on Ole Rabanal</description><generator>Hugo</generator><language>en-US</language><lastBuildDate>Sun, 01 Dec 2019 00:00:00 +0000</lastBuildDate><atom:link href="https://omrr.no/tags/python/index.xml" rel="self" type="application/rss+xml"/><item><title>Production lines for the ParQSense sensor and base station</title><link>https://omrr.no/projects/parqsense-production-lines/</link><pubDate>Sun, 01 Dec 2019 00:00:00 +0000</pubDate><guid>https://omrr.no/projects/parqsense-production-lines/</guid><description>&lt;p&gt;Software that builds physical products has an unusual property: the output is&#10;not a result on a screen, it is a device that leaves the building and cannot be&#10;patched afterwards.&lt;/p&gt;&#10;&lt;h2 id="context"&gt;Context&lt;/h2&gt;&#10;&lt;p&gt;August 2018 to December 2019, at Q-Free ASA in Trondheim, in a supply chain&#10;team that owned both the hardware and the software for the production lines.&lt;/p&gt;&#10;&lt;p&gt;Two closely related projects, each producing one production line: one for&#10;single IoT parking sensor units, and one for the base station that multiple&#10;parking units communicate with.&lt;/p&gt;</description></item><item><title>Production line for the RSE651 tolling transceiver</title><link>https://omrr.no/projects/rse651-transceiver-line/</link><pubDate>Sat, 01 Sep 2018 00:00:00 +0000</pubDate><guid>https://omrr.no/projects/rse651-transceiver-line/</guid><description>&lt;p&gt;The RSE651 is a DSRC transceiver, the unit in a tolling lane that communicates&#10;with the electronic toll tags in passing vehicles. This was the production line&#10;that manufactures it.&lt;/p&gt;&#10;&lt;h2 id="context"&gt;Context&lt;/h2&gt;&#10;&lt;p&gt;August to September 2018, at Q-Free ASA in Trondheim.&lt;/p&gt;&#10;&lt;p&gt;The line is semi-automated: operators assemble and move products from one step&#10;to the next through the production process. The team was a project manager, a&#10;hardware electrical engineer, and a software engineer.&lt;/p&gt;</description></item></channel></rss>